Loading
Our Recent Projects
Design, fabrication, and installation of underground cross-country pipeline systems.
Conversion of tanks to bitumen storage, including heating systems and related piping.
Installation of a 2200 TPD cryogenic tank and double-wall piping system.
Unloading, installation, alignment, and piping for 2250 KVA DG Sets (12 units).
Fabrication and installation of alloy steel and stainless steel above-ground piping.
Strengthening of Andheri Bridge with structural steel supports.
Installation of HSD systems, including diesel line transfer and instrumentation.
Installation of cryogenic tanks with capacities of 1800 TPD and 800 TPD.
Fabrication and installation of jetty piping and insulation for storage tanks.
Fabrication, erection, and piping for process equipment in chemical plants.
Design, fabrication, and erection of self-supported exhaust chimneys.
Construction and installation of 3500 KL bitumen storage capacity terminal.
Installation of FOHS for thermal power plants, including piping and alignment.
Design and installation of fire fighting systems for industrial plants.
Fabrication and installation of storage tanks for chemical and process industries.
Unloading, erection, and alignment of heavy industrial equipment.
Fabrication and installation of a 250 TPD cryogenic tank with piping systems.